Centrica doubling Rough storage capacity

London, 30 June, 2023, (Oilandgaspress) Centrica has announced increased gas storage capacity at Rough, the UK’s largest gas storage facility.

The facility, which is 18 miles off the coast of East Yorkshire, stopped storing gas in 2017 but was re-opened for gas storage in October 2022. Rough now provides half of the UK’s total gas storage.

At the time of reopening Rough for gas storage it was able to store approximately 30 billion cubic feet (bcf) of gas for UK homes and businesses. Further investment in the facility means Rough will now be able to store up to 54 bcf of gas, boosting the UK’s energy resilience for the coming winter – this would provide the equivalent volume of gas to heat 2.4 million homes over winter.

The UK has diverse gas supplies with connections with Norway and other European countries and 3 LNG import terminals. However, it still has some of the lowest levels of gas storage in Europe at 12 days average or 7.5 peak winter days, compared to Germany at 89 days, France at 103 days and the Netherlands at 123 days.


Information Source: Read More

Energy Monitors , Electric Power , Natural Gas , Oil , Climate , Renewable , Wind , Transition , LPG , Solar , Electric , Biomass , Sustainability , Oil Price , Electric Vehicles,